With -20 degree wind chill factors, Flotilla 4 members decided to do a little dry dock work during the December Training Weekend. Sunday was the tear down day in the Auxiliary facility project.
The crew got together and pulled this soon to be facility apart. The Radar came off, radios, cables, stereo, and trim pieces littered the floor of the shop. Wiring was checked, and in the end we now have a blank canvas from which to build an optimized Coast Guard Auxiliary Patrol Vessel. Stay tuned as this build project takes on a life of its own.
posted by Flotilla 4, Des Moines, Iowa #